Build and Installation
The first stage in the installation process was the removal of the old conservatory roof and dirty PVCu panels, along with the original windows and doors which were all carefully disposed of keeping the existing brickwork base intact.
This existing conservatory base was assessed to ensure the new structure could be safely installed, then the new installation was carried out in just 5 days! The new energy efficient glass that was used allows the conservatory to be warm throughout winter and cooler in the summer months – giving the customer the ability to use their new conservatory all year round.